Study Schedule and Status

The schedule presented below presents a simplified illustration of the study flow, which is anticipated to take 18 months to complete.  As the study moves forward, a number of Study Advisory Committee Meetings, Stakeholder Meetings, and Public Information Meetings will be held. 

Project Schedule

Study Status

The following provides a very brief summary of on-going work:

Early 2008:

  • Development of base mapping
  • Determination of existing conditions:
    • Ridership (demand)
    • Rail operations
    • Environmental overview
    • Formation of Study Advisory Committee
    • Stakeholder meetings
    • Preparation for upcomig passenger and zipcode surveys
  • Determination of a "long list" of potential branch line modifications/preliminary alternatives
Term Definition
Existing Conditions The conditions of the transportation facilities and the surrounding environment as they currently exist in 2007-2009
Alternatives Potential modifications that utilize the existing rail and/or roadway corridors and create cost‑effective improvements targeted toward enhancing the attractiveness of transit and reducing the demand for auto use for commuting.
Future No-Build Conditions The condition of the transportation system and surrounding environment 20-25 years into the future assuming no transportation improvements other than normal maintenance and currently programmed improvements are implemented.


 